Our Projects

Utility-scale generation, grid infrastructure and the planning work that gets power to people.

100 MW · Kaduna State

The Anjeed Kafanchan Solar

The Anjeed Kafanchan Solar is a fully developed 100 megawatt (MW) on-grid solar project on 265 hectares of land in Kafanchan/Kagoro in Kaduna State. The grid-connected facility will generate energy surpassing the power demand of the local governments connected to the substation, giving access to clean, renewable and reliable power to more than 500,000 Nigerians.

Increased demand from a growing population, paired with structural reforms, makes this the right time for the project. Nigeria’s power sector holds great potential for companies that plan strategically around a long-term vision and follow through with the hard work. African economies have tripled since 2000 and are predicted to remain among the fastest growing in the world.

Site plan of the 100 MW Anjeed Kafanchan Solar array
The 265-hectare array, planned around the existing waterway.

Transformer delivery at the Kafanchan substation
Transmission lines at the Kafanchan substation
Site works at the Kafanchan substation

Planning session with state electrification stakeholders
Working sessions with state planning institutions.

GIZ Nigerian Energy Support Programme

Partnered with Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ), the main German development agency, on Work Package 3 of the Nigerian Energy Support Programme.

The objective: develop five Rural Electrification Plans in the partner states of Niger, Ogun, Cross River, Plateau and Sokoto, and support the integration of state-level electrification planning at the federal level. Anjeed Commercial Services served as lead consultant for the five-state study, assessing planning institutions, their practices and the key actors at civil-service and political level.

Field documentation from our sites and engagements

Open the gallery

Let’s talk about your next project.

Contact us